NAGDHUNGA TUNNEL CONSTRUCTION PROJECT

WhatsApp Image 2021-10-18 at 17.35.00
WhatsApp Image 2021-10-18 at 17.34.58
WhatsApp Image 2021-10-18 at 17.34.54
WhatsApp Image 2021-10-18 at 17.34.50
Tunnel
Tunnel1

Previous
Next
Sub- Contractor of Hazama Ando corporation for Tunnel Civil works (Excavation with Supports Works and Lining Concrete). The tunnel construction is split into two parts:

  1. Main tunnel: Length: 2672m, Cross Section Area: 110.0m2
  2. Evacuation Tunnel: Length: 2548.5m, Cross Section Area: 18.16m2

Tunnel Type: Road Tunnel

Status: 30% Completed